国模少妇一区二区三区,俄罗斯女人与性动交,成人综合婷婷国产精品久久,欧美特黄特色三级视频在线观看

classic case

Project Name:Huadian ** Power Generation Co., Ltd.

Huadian ** Power Generation Co., Ltd.
Huadian ** Power Generation Co., Ltd.
Huadian ** Power Generation Co., Ltd.
Huadian ** Power Generation Co., Ltd.
Project Introduction:

System process:

Lake water → mechanically accelerated sedimentation tank → raw water tank → sand filter → ultrafiltration → intermediate water tank → reverse osmosis → decarburization → clean water tank → ion exchange (anion, cation bed, mixed bed) → demineralized water for boiler

System scale:

≧65T/H (25℃ water temperature)×2 groups

system issue:

The water production of the system drops rapidly in a short time, and the cleaning cycle is shortened to 2 months

problem found:

Severe mechanical fouling and colloidal pollution were found on the membrane inlet end cap and reverse osmosis membrane surface

solution:

By off-line cleaning and adjustment and optimization of the system, the cleaning cycle of reverse osmosis can be extended to 1 year!