classic case
Project situation: An Environmental Energy Co., Ltd. in Ningbo is a waste incineration power plant. It is equipped with a cooling circulating water system with a circulation of 16000m3/h. The supplementary water quality of the system is the river water near the power plant, and the leachate treats the produced water.
The main problems of the project: bacteria and algae reproduction, slime, poor water quality
Serial number | project | System parameters |
1 | Circulating water volume (m3/h) | 16000 |
2 | Water retention m3 | 3000 |
3 | System equipment material | Carbon steel, copper, stainless steel |
4 | Types of water treatment chemicals | Corrosion and scale inhibitor, bactericidal algicide, slime stripper |
Project operation control results: the system has been operating stably throughout the year, the bacteria, algae and slime are basically controlled, and the end difference is stable at about 8℃
Before dealing with project issues After the project problem is solved