A Renewable Energy Co., Ltd. is a waste incineration power plant. It is equipped with a set of cooling circulating water system with a circulation volume of 2000-2500m3/h. The supplementary water quality of the system is river water near the power plant, and the leachate is treated to produce water.
The main problems of the project: bacteria and algae reproduction, slime, and water quality are complicated
Project operation control results: the system has been operating stably throughout the year, the bacteria, algae and slime are basically controlled, and the terminal difference is stable at about 7℃
Serial number | Project | System parameters |
1 | Circulating water volume (m3/h) | 6000 |
2 | Water retention m3 | 4000 |
3 | System equipment material | Carbon steel, copper, stainless steel |
4 | Types of water treatment chemicals | Corrosion and scale inhibitor, bactericidal algicide, slime stripper |
Before dealing with project issues
After the project problem is solved